Pipeline Construction Western Canada May 14, 2021

Western Canada Pipeline Construction Summary

Pipeline Construction Western Canada last 7 days (report date May 14 2021). We are tracking 16 Canadian Oil & Gas Operators who had 32 pipeline permits approved for Construction for a total of 53KM of oil & gas pipeline projects.

  • Pipeline construction permit count by province – Alberta Pipeline Permits (32)
  • Pipeline construction permits by area & project distance – Wembley (pipeline permits 12), Bodo (pipeline permits 10), Fort Saskatchewan (pipeline permits 4), Grovedale (Pipeline Permits 3)

Download Western Canada Oil & Gas Pipeline Construction Permits

Oil Gas Asset Tracking

Western Canada Pipeline Construction Detail

Pipeline permits include gathering or transport pipelines of a liquid, gas or oil through a system of pipes. In addition to these main types of pipelines, there are also four other sub-categories of pipelines: Gathering Lines, Feeder Lines, Transmission Pipelines and Distribution Pipelines. The permits represent all types of pipelines. This section shows pipeline permits that have a new construction component. (Pipeline Construction Western Canada May 14 2021 report date )

JOURNEY ENERGY INC. 1.65KM Pipeline to Pipeline near Winfield.  Journey has decided to take a conservative approach to capital spending for 2021, with a focus on repaying the new borrowings from AIMCo.  The dramatic increase in commodity prices, coupled with favorable price differentials, and a lower cost structure are combining to make 2021 another transformational year for the Company. 

Journey is a Canadian exploration and production company focused on oil-weighted operations in western Canada.  Journey’s strategy is to grow its production base by drilling on its existing core lands, implementing waterflood projects, and by executing on accretive acquisitions.  Journey seeks to optimize its legacy oil pools on existing lands through the application of best practices in horizontal drilling and, where feasible, with water floods.

JOURNEY ENERGY INC. 1.65KM Pipeline to Pipeline construction near Winfield

TOURMALINE OIL CORP. 3 pipeline permits approved last week

1-24-053-24-W5 – 3.4KM Battery to Pipeline
1-26-059-26-W5 – 3.08KM Battery to Pipeline 
1-24-055-23-W5 – 4.98KM Pipeline to Pipeline

Lateral Completions Dissolvable Frac Plug

Western Canada Oil & Gas News


Pipeline Construction Western Canada Details

Petroleum pipelines transport oil, oil products and natural gas. In addition to these two main types of pipelines, there are also four other sub-categories of pipelines: Gathering Lines, Feeder Lines, Transmission Pipelines and Distribution Pipelines. The permits represent all types of pipelines. (pipeline permits Western Canada April 30 2021 report date )

Pipeline Construction Permits Western Canada May 14 2021

Sign-up Free Weekly Pipeline Permit Reports


* These fields are required.

About Enerlead Pipeline Report Overview

The location of the pipeline permits are the Western Canada Sedimentary Basin (WCSB) located in Western Canada including southwestern Manitoba, southern Saskatchewan, Alberta, northeastern British Columbia.

Pipeline permits are related to petroleum pipelines transport oil, oil products and natural gas. In addition to these two main types of pipelines, there are also four other sub-categories of pipelines: Gathering Lines, Feeder Lines, Transmission Pipelines and Distribution Pipelines. The permits represent all types of pipelines.