Ring Energy Expands Permian Position with Strategic CBP Acquisition

Ring Energy, Inc. (NYSE American: REI) has officially closed its acquisition of Central Basin Platform (CBP) assets from Lime Rock Resources, adding ~17,700 net acres in Andrews County, Texas to its growing Permian Basin footprint.

The newly acquired acreage, mostly contiguous to Ring’s existing Shafter Lake operations, brings in 2,300 Boe/d of low-decline, oil-weighted production from over 100 gross wells. Backed by a $120 million PD PV-10 reserve value and $34 million in projected 2025 EBITDA, the deal is expected to be highly accretive and free cash flow positive.

Why It Matters

This move enhances Ring’s position as a leading conventional player in the Permian, adds >40 high-return drilling locations, and opens the door to operational synergies and cost efficiencies. All acreage is 100% held by production, giving Ring full control over development pace and capital deployment.

Deal Snapshot:

  • Total Consideration: ~$63.6M cash, $10M deferred, 6.5M shares of REI
  • Location: Andrews County, Texas (Permian Basin)
  • Production: 2,300 Boe/d (80% oil)
  • Drilling Inventory: >40 gross locations

“We’re continuing to build a stronger, more resilient company by focusing on shallow decline, high-margin assets that compete immediately for capital,” said CEO Paul McKinney.

This acquisition marks another step in Ring’s strategy to consolidate legacy Permian assets and strengthen its financial and operational foundation for long-term success.


Oil & Gas Directory

The Permian in 2026 — What the Executives Are Really Signaling

The Permian in 2026 — What the Executives Are Really Signaling

The Q4 2025 earnings calls make it clear the Permian is no longer being run as a growth race, but ...
Whitecap Resources Inc.: Unconventional Execution, Wine-Rack Development, and the Path to Manufacturing

Whitecap Resources Inc.: Unconventional Execution, Wine-Rack Development, and the Path to Manufacturing

Whitecap Resources Inc. is using wine-rack development in its Montney and Duvernay assets to deliver 10–20% well performance gains and ...
Spartan Delta Corp: Duvernay-Focused Execution Anchored by Surface Optimization

Spartan Delta Corp: Duvernay-Focused Execution Anchored by Surface Optimization

Spartan Delta’s Duvernay-focused strategy is reflected in a 2025-heavy Willesden drilling permit inventory (20 CY+PY records) followed by a February ...
Whitecap Resources Inc. in Caroline: The Steady-State Mature Gas Field Playbook

Whitecap Resources Inc. in Caroline: The Steady-State Mature Gas Field Playbook

Whitecap Resources’ Caroline operations reflect a classic steady-state mature gas field strategy—incremental facility optimization, a modest CY+PY permit cadence (7 ...
Paramount Resources Ltd. Sanctions Sinclair: From Appraisal to Factory-Scale Montney Development

Paramount Resources Ltd. Sanctions Sinclair: From Appraisal to Factory-Scale Montney Development

Paramount has sanctioned the Sinclair Montney as a long-life, factory-scale gas development, backing strong appraisal results with a new high-throughput ...
Costa Energy → White Stride LLC: Air Permit Transfers Signal a Shift in Liberty County Operations

Costa Energy → White Stride LLC: Air Permit Transfers Signal a Shift in Liberty County Operations

A series of Texas Commission on Environmental Quality (TCEQ) air permits have recently been transferred from Costa Energy, LLC to ...
Admiral Permian Resources: A Delaware Basin Factory-Style Development in Loving County

Admiral Permian Resources: A Delaware Basin Factory-Style Development in Loving County

Admiral Permian Resources’ MAVERICKS project in Loving County is a tightly executed Delaware Basin factory-style development, with all wells concentrated ...
Amplify Energy Completes East Texas Exit as Air Permits (Facility) Transfer to EQV Operating

Amplify Energy Completes East Texas Exit as Air Permits (Facility) Transfer to EQV Operating

Amplify Energy’s October 2025 divestiture of its East Texas Haynesville and Cotton Valley assets is now reflected in completed TCEQ ...
Diamondback Energy Heidelberg 30-31 Program: A Full-Section Spraberry Factory in Martin County

Diamondback Energy Heidelberg 30-31 Program: A Full-Section Spraberry Factory in Martin County

The Heidelberg 30-31 program in Martin County is a full-section Spraberry cube development executed as a true factory, with 24 ...
Oklahoma Rig Activity Holds Steady as Operators Stay Disciplined

Oklahoma Rig Activity Holds Steady as Operators Stay Disciplined

Oklahoma’s rig count remains unchanged, with drilling concentrated in the Cana Woodford and Granite Wash as operators continue to prioritize ...