Ovintiv USA’s supplied DAVIDSON drilling report identifies nine horizontal permit records across two estimated surface pads in Upton County, Texas. Both pads share Block 40T5S, Abstract 1516, Section 10, placing the program within one common land reference in the Midland Basin’s Spraberry Trend.

The sales opportunity: DAVIDSON provides a useful model for targeting operators planning concentrated, multipad section development. Closely grouped permits, overlapping drilling activity and a subsequent production-facility air notification create a sequence of signals that OFS companies can use to pursue drilling, completions, infrastructure and production opportunities.
Pad development program
County / basin / play Pad Lease group Permit records Recorded activity period Contractor / rig Upton / Midland Basin / Spraberry Trend PAD-001 DAVIDSON C 3F and 3G 5 Aug. 5–31, 2026 Not supplied Upton / Midland Basin / Spraberry Trend PAD-002 DAVIDSON C 3A, 3X and 3XX 4 Aug. 19–Sept. 15, 2026 Not supplied Total 2 pads DAVIDSON lease family 9 Aug. 5–Sept. 15, 2026 Not supplied
Pads were estimated using the 50-metre transitive clustering rule. Eight records have Activity Dates; one PAD-001 record is treated as not yet drilled. Counts represent supplied records because numeric Licence Numbers were unavailable for well-level duplicate verification.
Program cadence
Measure DAVIDSON result Sales interpretation First licence date April 6, 2026 Early signal for program qualification and vendor discussions Last licence date May 5, 2026 Nine records accumulated within a 29-day licensing window Average gap between consecutive licence dates 3.63 days Includes same-day licences; reflects concentrated permitting First licence to first recorded activity 121 days Observed lead time for pursuing future drilling packages Average gap between consecutive Activity Dates 5.86 days Combined program cadence across both pads First-to-last recorded activity 41 days Concentrated execution across eight dated records Last activity to facility notification completion 35 days Subsequent signal for facility and production follow-up
Seven records were licensed on April 6, one on April 7 and one on May 5. The average first-to-last licensing span across the two pads was 15 days.
Pad First licence to first activity Average consecutive activity gap First-to-last activity span PAD-001 121 days 8.67 days 26 days PAD-002 135 days 9.00 days 27 days
For future sales planning, DAVIDSON suggests an initial working pattern of approximately four months from first permitting to first activity, followed by roughly nine days between recorded activities within each pad.
These are observations from one program, not fixed forecasts. Activity gaps do not measure drilling duration, and overlapping pad activity does not establish the number of rigs operating.
Subsurface profile
Measure PAD-001 PAD-002 All records Spraberry Trend field records 5 4 9 Horizontal drilling records 5 4 9 “Oil or Gas Well” records 5 4 9 Minimum projected depth 10,300 ft 10,300 ft 10,300 ft Maximum projected depth 10,300 ft 10,300 ft 10,300 ft Average projected depth 10,300 ft 10,300 ft 10,300 ft Aggregate projected depth 51,500 ft 41,200 ft 92,700 ft
The uniform field and projected-depth values suggest a repeatable drilling design. Aggregate projected depth is not verified footage drilled, and the CSV does not identify lateral lengths or individual landing zones.
Full-section or stacked reservoir development?
DAVIDSON is a candidate section-level co-development program: two pads share the same operator, land reference and lease family, with overlapping activity periods.
That makes it useful for building an ICP for full-section development. However, shared surface land references do not demonstrate that laterals drain the entire section. Confirming full-section development requires lateral paths, well spacing and the operator’s development plan.
Stacked reservoir development remains unconfirmed. One broad field designation and one projected-depth value do not establish multiple reservoir benches.
Production facility and air-permit connection
The supplied facility record identifies the related DAVIDSON 39 F11D project, completed after the recorded drilling campaign.
Facility Project / permit Location Received / completed Timing relative to drilling DAVIDSON 39 F11D 416913 / 185798; RN112552179 Upton County, near Midkiff, Texas Oct. 20, 2026 35 days after the final recorded activity
The project is an “OGS New Project Notification for New Registration” for an oil-and-gas production facility under a standard-permit category.
This is a useful production-readiness signal. A related facility milestone following drilling strengthens the case for discussing tie-ins, measurement, automation, chemicals and startup support.
The record shows the project and action as COMPLETE, while Permit Status is NO_STATUS and the rule approval field is N. It therefore supports a completed facility-notification milestone rather than explicit confirmation of approval or operating status. The supplied lease association connects it to the broader DAVIDSON story; its allocation to either pad remains unverified.
The ICP: operators developing a section as a coordinated program
The ideal customer is an operator organizing multiple wells and pads around a common development plan, with enough concentrated activity to benefit from coordinated service delivery.
ICP characteristic DAVIDSON evidence Prospecting qualification Multiple surface pads within a shared land reference Two pads in Block 40T5S, Abstract 1516, Section 10 Identify additional pads and planned wells within the development area Several wells permitted in a short period Nine records within 29 days Confirm funded scope, procurement timing and drilling order Repeatable well design All records horizontal at 10,300-ft projected depth Determine whether equipment and service packages can be standardized Concentrated drilling execution Eight dated activities over 41 days Establish crew capacity, delivery schedules and pad-to-pad logistics Related production infrastructure DAVIDSON 39 F11D notification completed after activity Verify facility capacity, tie-in scope and startup dates Potential recurring program One observed DAVIDSON campaign Ask which section or lease family follows next
Priority contacts include asset and development managers, drilling and completions managers, facilities engineers, production operations, water-management teams and supply chain.
The central qualification question is: “Are these pads part of one funded section-development schedule, and when must drilling, completions and facilities capacity be ready?”

Using cadence to pursue the next program
Trigger Sales action DAVIDSON timing reference A cluster of new permits appears Contact development, drilling and supply chain; establish the entire program scope Seven records shared the first licence date Program is qualified before activity Secure technical reviews, bids, equipment availability and service capacity First activity followed first licensing by 121 days First recorded activity appears Confirm subsequent well order and accelerate completions, water and logistics discussions Approximately nine days between activities within each pad Activity approaches the planned final wells Coordinate flowback, facility tie-ins, commissioning and production support Dated activity covered a 41-day program window Related facility notification appears Verify startup and pursue production optimization; request the next development schedule Facility milestone followed final activity by 35 days
For the next comparable program, sales teams should begin at permitting and work backward from the anticipated activity window. Completion and facility suppliers should establish requirements before the final drilling records appear; the facility notification is a follow-up trigger, not a dependable first opportunity to bid construction.
What OFS services does a multipad development require?
The following are service needs to qualify for a DAVIDSON-like program, rather than confirmed DAVIDSON purchases.
Development stage OFS services to qualify Value across multiple pads Development planning Reservoir modelling, landing-zone and spacing design, geomechanics, survey planning and offset-well review Coordinate well placement, sequencing and potential well interference Surface preparation Surveying, civil construction, roads, pad preparation, containment and utility planning Prepare locations for sequential work and shared logistics Drilling Rig services, directional drilling, MWD/LWD, bits, drilling fluids, solids control and rentals Support repeatable well delivery and efficient pad transitions Well construction Casing, tubular handling, cementing, wellheads and pressure testing Match equipment deliveries and crews to the drilling schedule Completions Fracturing, wireline and perforating, plugs, coiled tubing, drillout and pressure control Coordinate multiwell execution and reduce avoidable waiting time Water and materials Water sourcing, transfer, storage, recycling, produced-water handling, proppant and chemical logistics Maintain supply through concentrated completion demand Flowback and testing Temporary separation, sand management, flow measurement and fluid handling Manage the transition from stimulation to production Production facilities Separation, tanks, piping, gathering tie-ins, metering, electrical work and compression where needed Align facility capacity and readiness with well delivery Controls and environmental systems SCADA, communications, instrumentation, shutdown systems, emissions controls and leak detection Provide visibility and control across wells and shared infrastructure Production and Maintenance Plus Artificial-lift design, production chemicals, corrosion and scale management, surveillance and intervention Protect uptime and improve production after startup
Integrated drilling-to-facility coordination is an established multipad service approach. Multiwell completion methods can also coordinate fracturing and wireline activity across several wells, although the appropriate method depends on the operator’s design and site constraints.
The sales plan
For DAVIDSON, prioritize facility-status verification, production readiness and the remaining undated record. Confirm which wells DAVIDSON 39 F11D serves, whether production has started, and whether outstanding work remains in tie-ins, controls, measurement, water handling or production optimization.
For future prospects, use the DAVIDSON pattern to identify concentrated permits, related pads, shared section references and a repeatable drilling design. Sell a coordinated program with scheduled deliveries, crew continuity and clear handoffs between drilling, completions and facilities.
The strongest opportunity is to become involved while the operator is still planning the section—then remain engaged through first production and Maintenance Plus.