OVINTIV CANADA Pipestone Processing Facility Mulligan Loop Pipeline Gathering Pipeline

OVINTIV CANADA West Leg, South Leg, and Interconnect of the Pipestone Processing Facility Gathering Pipeline Project.  The pipeline is located within the White Area of north-west Alberta and transports various contents parallel to the existing Encana Mulligan Loop Project pipeline. The West Leg transport sour gas, water, and high-pressure fuel gas. The South Leg transport sour gas, and high-pressure fuel gas. The Interconnect will transport sour gas, sour emulsion, and fuel gas.

Segment 1 of the Mulligan Loop Pipeline Project. The pipeline will be 21.9 km long and will transport sour gas discharge, fuel gas and sour gas.

Segment 2 of the pipeline will transport low vapor pressure product, sour gas discharge, and include a water injection line.

Segment 3 will transport sour gas discharge, low vapor pressure product, and includes a sour gas gathering system.

Segment 5 will consist of a water injection line.

The first part of the pipeline project includes a total of 8,439 meters of right-of-way (ROW) pipeline, requiring approximately 710 meters of bores beneath roadways and pipelines. The total pipeline consists of 1.91 kilometers with five lines of pipe, 1 kilometer with four lines of pipe, and 5.5 kilometers with three lines of pipe. The project, which will have pig barrels at each end for cleaning purposes, also calls for installation of seven camelback risers and roughly 3,000 diameter weld inches.

The second part of the pipeline project consists of 3,070 meters of ROW, comprised of 1.97 kilometers with five lines of pipe and 1.1 kilometers with four lines of pipe. The project will require installation of two camelback risers, approximately 245 meters of bores beneath roadways, and roughly 2,205 diameter weld inches.