Petroplex Energy has been busy this year

Petroplex Energy, Inc. is a Midland-based Permian Basin operator with 98 producing wells reported by ShaleXP, whose production coverage extends through September 2026. The supplied YTD drilling report identifies 14 wells with 2026 Activity Dates across five estimated pads in Borden and Reeves counties.

The sales opportunity was: Two distinct development areas are represented: an early-year Borden County Spraberry program and a larger Reeves County Wolfbone/Wolfcamp-area program active from July through October. A Banner Battery air-permit record provides a potential facility connection to the Borden program.

Pad development program

County / basin / playPadLease groupWellsRecorded activity periodContractor / rig
Borden / Midland Basin / SpraberryPAD-001Banner B and D2Jan. 3–13, 2026Lasso 103
Borden / Midland Basin / SpraberryPAD-002Banner West A–C3Feb. 4–23, 2026Lasso 103
Reeves / Delaware Basin / Wolfbone–WolfcampPAD-003South Rockfish G; Viperfish Unit A2Sept. 20–Oct. 3, 2026Lasso 103
Reeves / Delaware Basin / WolfbonePAD-004South Rockfish D–F and H4July 22–Sept. 6, 2026Lasso 103
Reeves / Delaware Basin / WolfbonePAD-005South Rockfish A–C3July 26–Sept. 8, 2026Lasso 104
Total5 pads14Jan. 3–Oct. 3, 20262 unique rigs

Borden accounts for two pads and five wells; Reeves accounts for three pads and nine wells. Basin/play classifications use county geography and recorded fields.

Program cadence

MeasureAll records combinedSales interpretation
Average gap between chronologically sorted licence dates30.2 daysIncludes same-day licences and gaps between separate programs
Average days between consecutive Activity Dates21.0 daysIncludes the long interval between February and July activity
Average first-to-last licence span per pad22.6 daysThree pads had all licences issued on the same day

The licence-date calculation includes 2025 licences for wells with 2026 activity. Activity gaps measure time between recorded well starts, not drilling duration.

PadAverage days between consecutive activitiesFirst-to-last activity span
PAD-00110.010 days
PAD-0029.519 days
PAD-00313.013 days
PAD-00415.346 days
PAD-00522.044 days

For sales planning, the individual programs show a more concentrated cadence than the overall average: roughly 10–22 days between recorded starts within each pad.

Contractors, rigs and substance

Contractor / rigWellsShare of YTD recordsPads represented
Lasso 1031178.6%4
Lasso 104321.4%1
Total14100%5
Substance — as recordedWellsShare
Oil or Gas Well1178.6%
Oil Well17.1%
Not reported214.3%

All 14 wells indicate horizontal drilling. Projected depths range from 9,000 to 11,000, totaling 143,300 in aggregate projected depth; this is not verified footage drilled.

Stacked reservoir or full-section development?

Reeves is a candidate for stacked, multi-pad development. All nine Reeves wells share Block 13, Abstract 5274, Section 296, while field labels and well-number suffixes suggest potential interval differentiation. Bone Spring and Wolfcamp are regionally stacked formations, making this interpretation geologically plausible.

However, the supplied records do not establish landing zones, completion intervals or lateral coverage. The sales description should therefore be “concentrated section-level development with potential stacked targets”; neither confirmed stacked development nor full-section drainage is demonstrated. Borden shows two separate multi-well Spraberry groups, with insufficient evidence of multiple target benches.

Air permits and facility connections

FacilityCountyTCEQ detailsCandidate pad connectionWells potentially associated
Banner BatteryBordenRN112443478; STDPMT; received May 6, 2026; “OGS New Project Notification for New Registration”PAD-001 and PAD-002, through Banner/Banner West lease-name matches5

The air-permit report contains eight 2026 records, of which Banner Battery is the only first-word facility-name match to the supplied well report. The remaining seven records do not match these five pads. PP TCEQ Accounts Report – by Da…

Banner is the strongest location for a production-facility sales follow-up: its January–February well activity precedes the May facility notification. This supports a potential transition toward production infrastructure, but the air-permit record alone does not confirm well completion, facility construction or startup, and it does not establish whether the battery serves one or both pads.

For account planning, prioritize Banner for facility-status verification and production-equipment discussions, and South Rockfish/Viperfish for drilling, completion and facility follow-up. No pad can be classified as confirmed completed from the supplied drilling and air-permit records alone.