Permits Summary
Texas oil & gas pipeline and facility permits last 7 days report dated April 26 2021 is tracking 23 Oil & Gas and Mid Stream Operators that had 43 pipeline and facilities approved permits.
Facility Permits Summary
Texas facility permits is tracking 14 Operators and 30 facility permits approved last week in Texas. Top Oil & Gas Operators approved for a facility permits include; BROOKSTON ENERGY INC. (8), FOURPOINT ENERGY LLC (7), Pioneer Natural Resources Company (2), West Texas Gas, Inc. (2)
Pipeline Permits Summary
Texas pipeline permits is tracking 9 Operators that have 13 pipeline permits approved in Texas last week. Oil & Gas Operators with new pipeline projects in Texas include; Western Refining, Inc. (5), XTO Energy Inc. (1), Blackbeard Operating (1), Crimson Energy Partners III, L.L.C. (1)
Download Texas pipeline and facility permits
Oil & Gas News

Permit Details
Texas Pipeline Permits
Pipeline permits include gathering or transport pipelines of a liquid, gas or oil through a system of pipes. In addition to these main types of pipelines, there are also four other sub-categories of pipelines: Gathering Lines, Feeder Lines, Transmission Pipelines and Distribution Pipelines. The permits represent all types of pipelines. Source Texas pipeline and facility permits April 26 2021

Texas Oil & Gas Facility Permits
Facilities are a system of vessels, piping, valves, tanks and other equipment that are used to gather, process, measure, store or dispose of petroleum, natural gas or water. … The upstream facility network includes equipment for the handling of oil, natural gas, natural gas liquids, and water. Source Texas pipeline and facility permits April 26 2021
We have 3 types of permits related to construction of new facilities the Permit Type is related to the stage of the project.
- Notify New – Prior to construction, a notification with basic information must be submitted.
- Initial -Ninety days after submitting the Initial Project Notification, a more detailed registration for the standard permit is required. This could be related to existing plant maintenance
- Revision – Permit approved with a revision to the permit. This could be related to existing plant maintenance

Free Weekly Pipeline & Facility Reports
* These fields are required.
Facility and Pipeline Project Details
Texas Facilities Interesting Projects
Navitas Midstream Midland Basin permit for a compressor station in GLASSCOCK county near GARDEN CITY. The location is in the SPRABERRY with Operators like XTO, Oxy & Pioneer.

DCP OPERATING COMPANY LP new facility permit for existing PEGASUS GAS PLANT. The plant is located in Midlan County near MIDKIFF Texas. Located in the SPRABERRY play.
Operators in the area include Pioneer & Conocophillips. PEGASUS GAS PLANT is part of the Permian Basin DCP network that includes 17 Gas Processing Plants, 2 fractionators ~18,000 miles of pipelines 1.3+ Bcf/d processing capacity ~135,000+ Bbls/d NGL production


EAGLECLAW MIDSTREAM VENTURES facility permit for BREES COMPRESSOR STATION. Compressor is located in LOVING county near MENTONE. Operators in the area include Devon & Oxy.

WTG SOUTH PERMIAN MIDSTREAM facility permit for the BENEDUM GAS PLANT located UPTON County near RANKIN.


WTG facility permit for existing GLEN COVE COMP STATION located COLEMAN County near GLEN COVE


Texas Pipeline Projects
CRIMSON ENERGY PARTNERS new 1 mile pipeline project located DIMMIT County. Crimson Energy Partners IV, LLC (“Company”) is a private, independent exploration, production and development company based in Fort Worth, Texas with a focus on opportunities in South Texas.

XTO ENERGY INC. adding .19KM to exiting pipeline