CNOOC Oil Sands – Long Lake & Kinosis

Canada is home to the world’s third-largest hydrocarbon basin – the oil sands – which equates to 97% of Canada’s oil reserves. This long-term resource offers energy potential – about 1.7 trillion barrels of oil can be recovered, of which 165 billion barrels are in the oil sands. Alberta is…

read more

Enbridge Wood Buffalo Pipeline Extension

The Wood Buffalo Pipeline Extension Project (the Project) is a new 459 km, 762 mm (30-inch) pipeline, transporting diluted bitumen (dilbit) south from the Enbridge Cheecham Terminal to the Enbridge Battle River Terminal. The pipeline was never completed. ROW was prepped and pipe stock piled and that’s where it’s been…

read more

Plateau Pipe Line Ltd. Northeast B.C. Expansion Project

Plateau Pipe Line Ltd., a subsidiary of Pembina Pipeline Corporation (“Pembina”) is currently expanding their pipeline infrastructure in northeast B.C. with an approximately 147 km, 12-inch pipeline to transport condensate and natural gas liquids from the Montney resource play. https://www.bcogc.ca/public-zone/major-projects-centre/northeast-bc-expansion-project

read more

Keyera Energy Ltd. Keylink Pipeline Project

Keyera Energy Ltd. Keylink Pipeline Project. The project is located within the whtie and green areas of central Alberta and will transport High Vapour Pressure (HVP propane plus products from eight Keyera gas plants to the Keyera Rimbey Gas Plant, west of Rimbey. The proposed project includes a Mainline and…

read more

Inter Pipeline Ltd. – Cold Lake pipeline system

The Cold Lake pipeline system is the largest transporter of Cold Lake area bitumen production. It provides pipeline transportation service for the founding shippers; FCCL Partnership, Canadian Natural Resources and Imperial Oil, and also provides product transportation service for OSUM and Cenovus Energy. The producers’ heavy bitumen is blended with…

read more

Suncor Lewis in situ project

Lewis is a proposed multi-stage in situ project. Wholly owned by Suncor, the Lewis project is located in the Regional Municipality of Wood Buffalo, approximately 25 kilometres northeast of Fort McMurray, Alberta and approximately 18 kilometres southeast of Fort McKay. The total project area is estimated to cover 25,570 hectares…

read more

Enbridge Norlite Pipeline Project

Norlite Pipeline Project – accommodate the need for additional diluent supply to serve the planned expansion of Alberta oil sands, Enbridge Athabasca is proposing to construct and operate the Norlite Pipeline Project. The Project is comprised of a new pipeline and associated facilities to transport diluent from Enbridge Athabasca’s existing…

read more

Pembina Pipeline Corporation Big Smoky Pipeline Project

Pembina Pipeline Corporation is requesting an approval under Environmental Protection and Enhancement Act to construct the Big Smoky Pipeline Project. The Project consists of one pipeline originating at Pembina’s existing La Glace Pump Station (9-7-73-08 W6M) and terminating at Pembina’s existing Valleyview Pump Station (12-10-69-22 W5M). The Project is proposed…

read more