Technology for reusing flowback and produced water offers solutions for regions facing limited water sources and drought.
Mid Con (TX,OK,LA,NM) Wells Spud (drilled) Last 30 Days – download report
147 Oil & Gas Operators that spud (drilled) 681 wells in Texas, Louisiana, New Mexico & Oklahoma last 30 days. The map shows the location and spud count.
Mid Continent Well Permits Top 25 Operators – download full list
141 Operators that had 770 well permits approved in Texas, New Mexico, Louisiana & Oklahoma Last 30 Days.
Mid Con (TX,OK,NM,LA) rig count last 30 days – click for report
We are tracking 126 oil & gas Operators and 317 rigs the SPUD (drilled) wells in the Mid Continent (Texas, Oklahoma, New Mexico, Louisiana) last 30 days (post date Jan 21 2021) Map of rig count & location Download 30 day Mid Con rig report Sponsor Performance Pulsation Control™ specializes…
Mid Con (TX,OK,NM,LA) Drilling Recovery – spud count & Average
wells spud count and wells spud average for the last 12 months in Texas, Oklahoma, New Mexico & Louisiana.
Mid Con (TX,OK,NM,LA) Top 30 Operators by Well Permit
Top 30 Operators by well permits approved located Texas, Oklahoma, New Mexico and Louisiana.
Chesapeake Energy goes bankrupt – Map Shows Wells Drilled Last 2 Years
Chesapeake Energy’s bankruptcy plan was approved by U.S. bankruptcy judge David Jones.
Mid Con Top 25 Operators by Wells Spud Last 30 Days Jan 2021
Mid Con (Texas, Oklahoma, New Mexico, Louisiana) Operators by wells spud last 30 days (report post date Jan 13 2021.
Mid Con Wells Spud Average Jan 2021 – Recovery
Drilling recovery in the Mid Con (Texas, New Mexico, Oklahoma, Louisiana) is well underway. Download Mid Con wells spud in January 2021 Sponsor Performance Pulsation Control Performance Pulsation Control specializes in the design and manufacture of Pulsation Control Devices. Our expert engineers provide custom solutions for Oil & Gas, Well…
Summit Midstream Partners LP sanctioned Double E 135-mile Permian natural gas pipeline
The Summit Midstream owners of the Double E natural gas pipeline have asked federal regulators for permission to begin construction on the 135-mile Permian Basin conduit.