Western Canada Pipeline Construction October 23 2021 – We are tracking 53 Canadian Oil & Gas Operators who had 121 pipeline permits approved for for a total of 313KM of oil & gas pipeline projects.

  • Pipeline construction permits by top operators & permit count – CNRL 9(13), Karve Energy Inc. (4), Whitecap Resources Inc. (7)
  • Pipeline construction permit count by province – Alberta Pipeline Permits (107), Sask Pipeline Permits (14), BC Pipeline Permits (0)
  • Pipeline construction permits by area & project distance – Rocky Mountain House (43KM), La Glace (29KM), GROVEDALE (22KM)

Texas Pipeline Construction October 19 2021 – pipeline and facility project permits last 14 days report dated Oct 19 2021 is tracking 61 Oil & Gas and Mid Stream Operators that had 132 pipeline and facilities approved permits.


Western Canada Pipeline Construction October 15 2021 – We are tracking 26 Canadian Oil & Gas Operators who had 50 pipeline permits approved for for a total of 61KM of oil & gas pipeline projects.

  • Pipeline construction permits by top operators & permit count – Crescent Point Energy Corp. (13), SURGE ENERGY INC. (4), Hummingbird Energy Inc (3)
  • Pipeline construction permit count by province – Alberta Pipeline Permits (23), Sask Pipeline Permits (27), BC Pipeline Permits (0)
  • Pipeline construction permits by area & project distance – Fox Creek (12.91KM), Marlboro (6.7KM), Tilley (6.59KM)

Western Canada Pipeline Construction October 7 2021 – We are tracking 14 Canadian Oil & Gas Operators who had 21 pipeline permits approved for for a total of 128KM of oil & gas pipeline projects.

  • Pipeline construction permits by top operators & permit count – Advantage Oil and Gas Ltd. (3), ARC Resources Ltd (3), Longshore Resources (3), CNRL (2)
  • Pipeline construction permit count by province – Alberta Pipeline Permits (21), Sask Pipeline Permits (0), BC Pipeline Permits (0)
  • Pipeline construction permits by area & project distance – La Glace (29KM), Valhalla (22KM), Grovedale (8.5KM)

Texas Pipeline Construction October 4 2021 – pipeline and facility project permits last 7 days report dated Oct 4 2021 is tracking 28 Oil & Gas and Mid Stream Operators that had 62 pipeline and facilities approved permits.


Western Canada Pipeline Construction September 30 2021 – We are tracking 39 Canadian Oil & Gas Operators who had 80 pipeline permits approved for for a total of 272KM of oil & gas pipeline projects.

  • Pipeline construction permits by top operators & permit count – Crescent Point Energy Corp. (10), CNRL (9), Peyto Exploration (5), Bonavista Energy (3)
  • Pipeline construction permit count by province – Alberta Pipeline Permits (67), Sask Pipeline Permits (13), BC Pipeline Permits (0)
  • Pipeline construction permits by area & project distance – O’Chiese (59KM), Smith (31), Beaverlodge (24)

Texas Pipeline Construction September 27 2021 – pipeline and facility project permits last 7 days report dated Sept 27 2021 is tracking 45 Oil & Gas and Mid Stream Operators that had 126 pipeline and facilities approved permits.


Western Canada Pipeline Construction September 23 2021 – We are tracking 34 Canadian Oil & Gas Operators who had 96 pipeline permits approved for Construction for a total of 87KM of oil & gas pipeline projects.

  • Pipeline construction permits by top operators & permit count – Crescent Point Energy Corp. (17), Jarrod Oils Ltd (10), Teine Energy Ltd (9), CNRL (6)
  • Pipeline construction permit count by province – Alberta Pipeline Permits (45), Sask Pipeline Permits (51), BC Pipeline Permits (0)
  • Pipeline construction permits by area & project distance – Lodgepole (8.29), Lac Ste. Anne County (5.79), Marlboro (4.22)

Texas Pipeline Construction September 20 2021 – pipeline and facility project permits last 7 days report dated Sept 20 2021 is tracking 24 Oil & Gas and Mid Stream Operators that had 66 pipeline and facilities approved permits.


Western Canada Pipeline Construction September 14 2021 – We are tracking 47 Canadian Oil & Gas Operators who had 97 pipeline permits approved for Construction for a total of 376KM of oil & gas pipeline projects.

  • Pipeline construction permits by top operators & permit count – Crescent Point Energy Corp. (9), Teine Energy Ltd (9), CNRL (6), Whitecap Resources Inc. (5)
  • Pipeline construction permit count by province – Alberta Pipeline Permits (65), Sask Pipeline Permits (32), BC Pipeline Permits (0)
  • Pipeline construction permits by area & project distance – Landry Heights (31), Marten Beach (31), Fox Creek (28)

Texas Pipeline Construction September 11 2021 – pipeline and facility project permits last 7 days report dated Sept 11 2021 is tracking 23 Oil & Gas and Mid Stream Operators that had 33 pipeline and facilities approved permits.


Texas Pipeline Construction September 3 2021 – pipeline and facility project permits last 7 days report dated Sept 3 2021 is tracking 27 Oil & Gas and Mid Stream Operators that had 40 pipeline and facilities approved permits.


Western Canada Pipeline Construction August 30 2021 – We are tracking 18 Canadian Oil & Gas Operators who had 25 pipeline permits approved for Construction for a total of 42KM of oil & gas pipeline projects.


Texas Pipeline Construction August 26 2021 – pipeline and facility project permits last 7 days report dated Aug 26th 2021 is tracking 35 Oil & Gas and Mid Stream Operators that had 74 pipeline and facilities approved permits.


Western Canada Pipeline Construction August 23 2021 – We are tracking 36 Canadian Oil & Gas Operators who had 71 pipeline permits approved for Construction for a total of 149KM of oil & gas pipeline projects.

  • Pipeline construction permits by top operators & permit count – Crescent Point Energy Corp. (11), Whitecap Resources Inc. (9), Karve Energy Inc. (5), Teine Energy Ltd (4)
  • Pipeline construction permit count by province – Alberta Pipeline Permits (33), Sask Pipeline Permits (36), BC Pipeline Permits (2)
  • Pipeline construction permits by area & project distance – Three Hills (36), Yellowhead County (14), Chetwynd (8.9), Grovedale (6)

Texas Pipeline Construction August 19 2021 – pipeline and facility project permits last 7 days report dated Aug 19th 2021 is tracking 27 Oil & Gas and Mid Stream Operators that had 81 pipeline and facilities approved permits.


Texas Pipeline Construction August 10 2021 – pipeline and facility project permits last 7 days report dated Aug 10th 2021 is tracking 18 Oil & Gas and Mid Stream Operators that had 56 pipeline and facilities approved permits.


Western Canada Pipeline Construction August 3 2021 – We are tracking 24 Canadian Oil & Gas Operators who had 46 pipeline permits approved for Construction for a total of 92KM of oil & gas pipeline projects.

  • Pipeline construction permits by top operators & permit count – Tamarack Valley Energy Ltd (6), CNRL (5), ARCHER EXPLORATION CORP. (3), Keyera Energy Limited Partnership (3)
  • Pipeline construction permit count by province – Alberta Pipeline Permits (46),
  • Pipeline construction permits by area & project distance – Grovedale (46), Lodgepole (8.26), Bodo (7.59)

Texas Pipeline Construction August 2 2021 – pipeline and facility project permits last 7 days report dated Aug 2nd 2021 is tracking 31 Oil & Gas and Mid Stream Operators that had 98 pipeline and facilities approved permits.

  • Top Oil & Gas Operators approved for a facility permits include; VENCER ENERGY LLC (29), Diamondback Energy (10), PERCUSSION PETROLEUM OPERATING (10), Devon Energy Corporation (6)
  • Top Counties approved for a facility permits include; Upton (15), Living (12), Glasscock (9)
  • Top Oil & Gas Operators approved for a pipeline permits include; Howard Energy Partners (5), SLANT OPERATING, LLC (3), EASTON ENERGY PIPELINES LLC (2)

Texas Pipeline Construction July 27 2021 – pipeline and facility project permits last 7 days report dated July 27 2021 is tracking 26 Oil & Gas and Mid Stream Operators that had 85 pipeline and facilities approved permits.


Western Canada Pipeline Construction July 26 2021 – We are tracking 30 Canadian Oil & Gas Operators who had 87 pipeline permits approved for Construction for a total of 101KM of oil & gas pipeline projects.

  • Pipeline construction permits by top operators & permit count – Ridgeback Resources (32), Cenovus Energy Inc. (7), Tundra Oil & Gas Limited (5), Whitecap Resources Inc. (4)
  • Pipeline construction permit count by province – Alberta Pipeline Permits (30), BC Pipeline Permits (4), Saskatchewan Pipeline Permits (53)
  • Pipeline construction permits by area & project distance – Brock,SK (21KM), O’Chiese,AB (13.28KM), Lamont County,AB (11.28KM), Turtle River, SK (8KM)

Texas Pipeline Construction July 19 2021 – pipeline and facility project permits last 7 days report dated July 19 2021 is tracking 20 Oil & Gas and Mid Stream Operators that had 35 pipeline and facilities approved permits.

  • Top Oil & Gas Operators approved for a facility permits include; Surge Energy (7), HIGHPEAK ENERGY (4), OXY USA Inc. (4), APA Corporation (3)
  • Top Counties approved for a facility permits include; Howard (12), Reeves (6), Midland (2)
  • Top Oil & Gas Operators approved for a pipeline permits include; Energy Transfer (3)

Western Canada Pipeline Construction July 19 2021 – We are tracking 32 Canadian Oil & Gas Operators who had 67 pipeline permits approved for Construction for a total of 101KM of oil & gas pipeline projects.

  • Pipeline construction permits by top operators & permit count – Tourmaline Oil Corp (7), CNRL (9)Cenovus Energy Inc. (5), Astra Oil Corp (3), Crescent Point Energy Corp. (3)
  • Pipeline construction permit count by province – Alberta Pipeline Permits (19), BC Pipeline Permits (3), Saskatchewan Pipeline Permits (11)
  • Pipeline construction permits by area & project distance – Souris Valley (6KM), Horburg (6KM), Horburg (5.5KM)

Texas Pipeline Construction July 13 2021 – pipeline and facility project permits last 7 days report dated July 13 2021 is tracking 20 Oil & Gas and Mid Stream Operators that had 75 pipeline and facilities approved permits.

  • Top Oil & Gas Operators approved for a facility permits include; OXY USA Inc. (34), CRESCENT PASS ENERGY LLC (9), SCOUT ENERGY MANAGEMENT LLC (8), APA Corporation (3)
  • Top Counties approved for a facility permits include; Glasscock (10), Martin (10), Howard (8), Reeves (8)
  • Top Oil & Gas Operators approved for a pipeline permits include; GEMINI GARTHAGE PIPELINE, LLC (4), AGUA TRANQUILLO MIDSTREAM LLC (1)

Western Canada Pipeline Construction July 12 2021 – We are tracking 20 Canadian Oil & Gas Operators who had 33 pipeline permits approved for Construction for a total of 46KM of oil & gas pipeline projects.

  • Pipeline construction permits by top operators & permit count – Tourmaline Oil Corp (4), Astra Oil Corp (3), Cenovus (3), CNRL (2)
  • Pipeline construction permit count by province – Alberta Pipeline Permits (19), BC Pipeline Permits (3), Saskatchewan Pipeline Permits (11)
  • Pipeline construction permits by area & project distance – Souris Valley (6KM), Horburg (6KM), Horburg (5.5KM)

Texas Pipeline Construction July 6 2021 – pipeline and facility project permits last 7 days report dated July 6 2021 is tracking 24 Oil & Gas and Mid Stream Operators that had 40 pipeline and facilities approved permits.


Western Canada Pipeline Construction July 5 2021 – We are tracking 39 Canadian Oil & Gas Operators who had 152 pipeline permits approved for Construction for a total of 383KM of oil & gas pipeline projects.

  • Pipeline construction permits by top operators & permit count – Crescent Point Energy Corp. (20 permits), Whitecap Resources Inc. (15 Permits), Caltex Resources Ltd. (13 permits), Fire Sky Energy Inc (13 permits)
  • Pipeline construction permit count by province – Alberta Pipeline Permits (37), BC Pipeline Permits (1), Saskatchewan Pipeline Permits (114)
  • Pipeline construction permits by area & project distance – St. Andrews (85), Tecumseh (33), Landry Heights (31)

Texas Pipeline Construction June 29 2021 – pipeline and facility project permits last 7 days report dated June 29 2021 is tracking 28 Oil & Gas and Mid Stream Operators that had 52 pipeline and facilities approved permits.


Western Canada Pipeline Construction June 29 2021 – We are tracking 25 Canadian Oil & Gas Operators who had 38 pipeline permits approved for Construction for a total of 82KM of oil & gas pipeline projects.

  • Pipeline construction permits by top operators & permit count – Cenovus Energy Inc. (4 pipeline permits), Canadian Natural Resources Limited (3 pipeline permits), Aspenleaf Energy Limited ( 2 Pipeline Permits), Bonavista Energy Corporation (2 Pipeline Permits)
  • Pipeline construction permit count by province – Alberta Pipeline Permits (34), BC Pipeline Permits (4)
  • Pipeline construction permits by area & project distance – Wood Buffalo (26KM), Fort Saskatchewan (10.51 KM), O’Chiese (9.6KM)

Texas Pipeline Construction June 21 2021 – pipeline and facility project permits last 7 days report dated June 21 2021 is tracking 22 Oil & Gas and Mid Stream Operators that had 44 pipeline and facilities approved permits.

  • Top Oil & Gas Operators approved for a facility permits include; Oryx Midstream (9 permits), Pioneer Natural Resources Company (6 permits), Energy Transfer (3 Permits), PEREGRINE PETROLEUM PRTNR, LTD. (3 Permits)
  • Top Counties approved for a facility permits include; Martin (5), Upton (5), Midland (3), Reeves (3)
  • Top Oil & Gas Operators approved for a pipeline permits include; Cogent Midstream (1 permit), Oryx Midstream (1 permit)

Western Canada Pipeline Construction June 18 2021 – We are tracking 20 Canadian Oil & Gas Operators who had 31 pipeline permits approved for Construction for a total of 71KM of oil & gas pipeline projects.

  • Pipeline construction permits by top operators & permit count – Cenovus Energy Inc. (4 pipeline permits), Canadian Natural Resources Limited (4 pipeline permits), FortisBC Energy Inc. (3 pipeline permits)
  • Pipeline construction permit count by province – Alberta Pipeline Permits (26), BC Pipeline Permits (5)
  • Pipeline construction permits by area & project distance – Bruderheim (20),Vauxhall (83), Reg Mun of Wood Buffalo (13.9), La Glace (6.2)

Texas Pipeline Construction June 14 2021 – pipeline and facility project permits last 7 days report dated June 14 2021 is tracking 24 Oil & Gas and Mid Stream Operators that had 34 pipeline and facilities approved permits.


Western Canada Pipeline Construction June 11 2021 – We are tracking 2o Canadian Oil & Gas Operators who had 41 pipeline permits approved for Construction for a total of 800KM of oil & gas pipeline projects.

  • Pipeline construction permits by top operators & permit count – Cenovus Energy Inc. (5), PEMBINA NGL (5), TORXEN RESOURCES LTD. (3), Tourmaline Oil Corp (2)
  • Pipeline construction permit count by province – Alberta Pipeline Permits (35), BC Pipeline Permits (6)
  • Pipeline construction permits by area & project distance – Fabyan (640),Vauxhall (83), Reg Mun of Wood Buffalo (17)

Texas Pipeline Construction June 8 2021 – pipeline and facility project permits last 7 days report dated June 8 2021 is tracking 34 Oil & Gas and Mid Stream Operators that had 81 pipeline and facilities approved permits.


Western Canada Pipeline Construction June 4 2021 – We are tracking 25 Canadian Oil & Gas Operators who had 38 pipeline permits approved for Construction for a total of 80KM of oil & gas pipeline projects.


Texas Pipeline Construction June 1 2021 – pipeline and facility project permits last 7 days report dated June 1 2021 is tracking 32 Oil & Gas and Mid Stream Operators that had 62 pipeline and facilities approved permits.


Western Canada Pipeline Construction May 28 2021 -We are tracking 20 Canadian Oil & Gas Operators who had 35 pipeline permits approved for Construction for a total of 90KM of oil & gas pipeline projects.


Texas Pipeline Construction May 25 2021 – pipeline and facility project permits last 7 days report dated May 25 2021 is tracking 31 Oil & Gas and Mid Stream Operators that had 291 pipeline and facilities approved permits.

  • Top Oil & Gas Operators approved for a facility permits include; Extex Operating Company (197), Pioneer 34, Validus Energy (24), Upcurve Energy (3)
  • Top Counties approved for a facility permits include; Sutton (25), Karnes (24), Martin (24), Upton (24)
  • Top Oil & Gas Operators approved for a pipeline permits include; O’RYAN OIL AND GAS (4), Energy Transfer (1), U.S. Energy Development Corporation (1)

Western Canada Pipeline Construction May 21 2021 – We are tracking 26 Canadian Oil & Gas Operators who had 37 pipeline permits approved for Construction for a total of 88KM of oil & gas pipeline projects.

  • Pipeline construction permits by top operators & permit count – Canadian Natural Resources Limited (pipeline permits 4), Peyto Exploration (pipeline permits 4), Inter Pipeline Ltd. (pipeline permits 3), ARC Resources Ltd (pipeline permits 2), Baytex Energy Corp. (pipeline permits 2)
  • Pipeline construction permit count by province – Alberta Pipeline Permits (30), BC Pipeline Permits (7)
  • Pipeline construction permits by area & project distance – Yahk (pipeline distance 12KM), Greenview (pipeline distance 12KM), Wood Buffalo (pipeline distance 10), Grande Prairie (pipeline distance 8KM)

Texas Pipeline Construction May 17 2021 – pipeline and facility project permits last 7 days report dated May 17 2021 is tracking 18 Oil & Gas and Mid Stream Operators that had 23 pipeline and facilities approved permits.


Western Canada Pipeline Construction May 14 2021 – We are tracking 16 Canadian Oil & Gas Operators who had 32 pipeline permits approved for Construction for a total of 53KM of oil & gas pipeline projects.

  • Pipeline construction permits by top operators & permit count – Canadian Natural Resources Limited (pipeline permits 7), Caltex Resources Ltd. (pipeline permits (3), Pipestone Energy (pipeline permits 3), Tourmaline Oil Corp (pipeline permits 3), Inter Pipeline Ltd. (pipeline permits 2)
  • Pipeline construction permit count by province – Alberta Pipeline Permits (32)
  • Pipeline construction permits by area & project distance – Wembley (pipeline permits 12), Bodo (pipeline permits 10), Fort Saskatchewan (pipeline permits 4), Grovedale (Pipeline Permits 3)

Texas Pipeline Construction May 10 2021 – pipeline and facility permits last 7 days report dated May 10 2021 is tracking 20 Oil & Gas and Mid Stream Operators that had 31 pipeline and facilities approved permits.

  • Top Oil & Gas Operators approved for a facility permits include; Diamondback Energy (5), Henry Resources LLC (3), SM Energy Company (3), APR OPERATING LLC (2), Lonestar Resources (2)
  • Top Counties approved for a facility permits include; Howard (2), La Salle (2), Martin (2), Reeves (2)
  • Top Oil & Gas Operators approved for a pipeline permits include; Pin Oak Corpus Christi (2), ENTERPRISE Products (1), ENLINK MIDSTREAM SERVICES LLC (1), Bc Operating Inc. (1)

Texas Pipeline Construction May 2 2021 – pipeline and facility permits last 7 days report dated May 2 2021 is tracking 35 Oil & Gas and Mid Stream Operators that had 86 pipeline and facilities approved permits.


Western Canada Pipeline Construction April 30 2021 – We are tracking 17 Canadian Oil & Gas Operators who had 21 pipeline permits approved for a total of 38KM of oil & gas pipeline projects.


Texas Pipeline Construction April 26 2021 – pipeline and facility permits last 7 days report dated April 26 2021 is tracking 23 Oil & Gas and Mid Stream Operators that had 43 pipeline and facilities approved permits.

Facility Permits Summary

Texas facility permits is tracking 14 Operators and 30 facility permits approved last week in Texas. Top Oil & Gas Operators approved for a facility permits include; BROOKSTON ENERGY INC. (8), FOURPOINT ENERGY LLC (7), Pioneer Natural Resources Company (2), West Texas Gas, Inc. (2)

Pipeline Permits Summary

Texas pipeline permits is tracking 9 Operators that have 13 pipeline permits approved in Texas last week. Oil & Gas Operators with new pipeline projects in Texas include; Western Refining, Inc. (5), XTO Energy Inc. (1), Blackbeard Operating (1), Crimson Energy Partners III, L.L.C. (1)


Western Canada Pipeline Construction April 23 2021 – We are tracking 11 Canadian Oil & Gas Operators who had 24 pipeline permits approved for a total of 41KM of oil & gas pipeline projects.

  • Pipeline permits by top operators & permit count – NuVista Energy Ltd. (5), CNRL (3), Cenovus Energy Inc. (3), Crescent Point Energy Corp. (3)
  • Pipeline permit count by province – Alberta (18), BC (4), SK (2)
  • Pipeline permits by area & project distance – Wembley (3). Greenview County (3), Wood Buffalo (3), Fort Saskatchewan (2)

Texas Pipeline Construction April 19 2021 – pipeline and facility permits report dated April 19 2021 is tracking 31 Oil & Gas and Mid Stream Operators that had 42 pipeline and facilities approved permits.

Facility Permits Summary

Texas facility permits is tracking 16 Operators and 24 facility permits approved last week in Texas. Top Oil & Gas Operators approved for a facility permits include; DAYLIGHT PETROLEUM LLC (4), Primexx Operating Corporation, Valence Operating Company (2), Chevron U.S.A. Inc. (2), Centennial Resource Production, LLC (2)

Pipeline Permits Summary

Texas pipeline permits is tracking 15 Operators that have 18 pipeline permits approved in Texas last week. Oil & Gas Operators with new pipeline projects in Texas include FAULCONER VERNON E. INC. (3), SINCLAIR OIL & GAS COMPANY (2), BESCO OPERATING L.P. (1), ExxonMobil Corporation (1)


Western Canada Pipeline Construction April 16 2021 – We are tracking 22 Canadian Oil & Gas Operators who had 38 pipeline permits approved for a total of 63KM of oil & gas pipeline projects.

  • Pipeline permits by top operators & permit count – Tourmaline Oil Corp (5), Canadian Natural Resources Limited (4), PETRONAS Energy Canada Ltd. (4), Deltastream Energy Corporation (3), Seven Generations Energy Ltd. (3)
  • Pipeline permit count by province – Alberta (24), BC (14)
  • Pipeline permits by area & project distance – BC (24), Marlboro (15), Lac Ste. Anne County (5.4), Hinton (5), Calling Lake (2.2), O’Chiese (2.25)

Texas Pipeline Construction April 12 2021 – pipeline and facility permits report dated April 12 2021 is tracking 31 Oil & Gas and Mid Stream Operators that had 73 pipeline and facilities approved permits.

Facility Permits Summary

Texas facility permits is tracking 18 Operators and 57 facility permits approved last week in Texas. Top Oil & Gas Operators approved for a facility permits include Basa Resources, Inc. (7), Silver Creek Oil & Gas, LLC (11)Devon Energy Corporation (5) and Chevron (4)

Pipeline Permits Summary

Texas pipeline permits is tracking 13 Operators that have 16 pipeline permits approved in Texas last week. Oil & Gas Operators with new pipeline projects in Texas include Earthstone Operating, LLC (2), Smith Production Inc. (2) and Surge Energy America (2)