The Windham Row Development, as detailed in Coterra’s earnings presentation, represents a significant advancement in the company’s strategic approach to optimizing oil and gas production. This 54-well project, spanning six drilling spacing units (DSUs), leverages simultaneous operations (Simul-Ops) and simul-fracking to enhance efficiency, reduce costs, and accelerate production timelines.
Coterra Energy Reports Strong Q2 2024 Results using Simul-Frac Efficiencies
