The Wood Buffalo Pipeline Extension Project (the Project) is a new 459 km, 762 mm (30-inch) pipeline, transporting diluted bitumen (dilbit) south from the Enbridge Cheecham Terminal to the Enbridge Battle River Terminal. The pipeline was never completed. ROW was prepped and pipe stock piled and that’s where it’s been…