TAQA North Ltd. CROSSFIELD EAST Gas Plant Upgrade

TAQA North was approved for a major upgrade of compressors at the CROSSFIELD EAST gas plant located 09-14-028-01W5. The project includes removal of two existing compressors and the addition of 4 new compressors.

CROSSFIELD EAST gas plant located 09-14-028-01W5

Facility Permit

CROSSFIELD EAST gas plant located 09-14-028-01W5 Compressor permits

Additional Project Related to the Plant

This project will demonstrate the benefits of acid gas injection (AGI) with a potential for localized enhanced gas recovery at the Crossfield Gas Plant. The project is expected to improve the sustainability of the gas plant by improving production efficiency and significantly reducing carbon compliance costs.  The process involves re-injecting acid gas, containing hydrogen sulfide and carbon dioxide, into a defined reservoir to significantly reduce atmospheric emissions. The project will reduce emissions by improving production efficiency, eliminating venting of reservoir carbon dioxide, and eliminating energy consumed in the treatment of acid gas. An added benefit will be the reduction of Greenhouse Gas (GHG) emissions through the optimization of boilers and compression. TAQA is developing this project in collaboration with ExxonMobil Canada.• Once implemented, acid gas injection and operational efficiencies are expected to reduce total emissions of the facility by more than 60 per cent.• This project estimates GHG emissions reductions by more than 300,000 tCO2e during the first five years of operation.


Sponsor

Material Resource Management (MRM) is a material management company specializing in site clean up, co-ordination of planning, sourcing, purchasing, moving , storing and controlling materials in an optimum manner so as to provide a pre-decided service to the customer at a minimum cost.

Material Resource Management (MRM) is a material management company specializing in site clean up, co-ordination of planning, sourcing, purchasing, moving , storing and controlling materials in an optimum manner so as to provide a pre-decided service to the customer at a minimum cost. MRM has a large inventory of owned equipment. We buy and sell Production Equipment, Access & Rig Matting, OCTG, Storage Tents, Copper and Aluminum Teck Cable, Line Pipe, Camps, Office/MCC Buildings and much more. 


Additional News


Free Weekly Permit Reports


* These fields are required.

One thought on “TAQA North Ltd. CROSSFIELD EAST Gas Plant Upgrade

  1. Pingback:Western Canada Spud Alert - download rig report – Oil Gas Leads

Comments are closed.