Comstock Resources Q2 2023 Drilling Results

Comstock drilled 21 (17.2 net) operated horizontal Haynesville/Bossier shale wells in the second quarter of 2023 which had an average lateral length of 10,887 feet. Comstock turned 17 (13.0 net) operated wells to sales in the second quarter of 2023.

Oil & Gas Data Download

Comstock Wells Drilled 2023

Comstock Rig Report July 2023

Haynesville Operator List

List of oil & gas Operators that are active in the Haynesville play

Since its last operational update in May, Comstock has turned 15 (12.0 net) operated Haynesville/Bossier shale wells to sales. These wells had initial daily production rates that averaged 21 MMcf per day. The completed lateral length of these wells averaged 10,671 feet.

Included in the wells turned to sales were the Dinkins JG #1 and the McCullough Ingram A #1, Comstock’s fourth and fifth successful Western Haynesville wells. The Dinkins well was drilled to a total vertical depth of 18,042 feet and has a 9,565 foot completed lateral. The well’s initial production rate was 34 MMcf per day. The McCullough Ingram well was drilled to a total vertical depth of 17,836 feet and has a 8,256 foot completed lateral. The well’s initial production rate was 35 MMcf per day.

Energy News