Rig count in the Mid Con last 30 days, report date Sept 12 2022. We are tracking 234 Oil & Gas Operators and 597 drilling rigs that drilled wells in 119 counties located in the Mid-continent.
Mid-continent Rig Count Sept 12 2022


Rig count in the Mid Con last 30 days, report date Sept 12 2022. We are tracking 234 Oil & Gas Operators and 597 drilling rigs that drilled wells in 119 counties located in the Mid-continent.

Texas oil & gas pipeline and facility project permits last 7 days report dated Sept 10, 2022 is tracking number 28 Oil & Gas and Mid Stream Operators that had 63 pipeline and facilities approved permits.

Pipeline Construction Western Canada last 7 days (report date Aug 25, 2022). We are tracking 19 Canadian Oil & Gas Operators who had 25 pipeline permits approved for for a total of 102KM of oil & gas pipeline projects.

CNRL updated 2022 base and strategic growth capital program is now targeted to be approximately $4.9 billion and corporate production guidance range is increasing to 1,295 MBOE/d to 1,335 MBOE/d.

Whitecap increasing our 2022 average production guidance by 4,000 boe/d to 142,000 – 144,000 boe/d and our capital spending guidance by $60 million to $670 – $690 million.

Canada Rig Count Report Sept 7, 2022 we are tracking 91 Oil & Gas Operators and 222 drilling rigs that spud wells last 30 days in Alberta, BC and Saskatchewan. (Data Source – Western Canada Drilling Rig Report Sept 7, 2022)

Rig count in the Mid Con last 30 days, report date Sept 7 2022. We are tracking 233 Oil & Gas Operators and 580 drilling rigs that drilled wells in 121 counties located in the Mid-continent. The Mid-continent rig count report contains information about drilling rigs and Operators in multiple oil & gas plays and basins located in Texas, Oklahoma, Mew Mexico and Louisiana.

The Permian Basin’s economic impact on Texas and the nation is growing. By 2050, the region is expected to contribute up to $260 billion in gross product and more than 1,000,000 jobs to the nation’s economy, according to a new report from The Perryman Group and the Permian Strategic Partnership (PSP).

A four-year Canadian export license extension has been granted to the delayed Cedar LNG project, which will be sited on the northwest coast of British Columbia.

As an in-house developed system, iSenseSM enables EOG to integrate the data it collects with existing operational data from EOG’s other proprietary systems. This allows for the unique ability to analyze production and facility data to conduct root cause analysis, prioritize resources and dispatch repair measures.
