Pipeline Construction Western Canada , Aug 3rd 2021

Western Canada Pipeline Construction Summary

Pipeline Construction Western Canada last 7 days (report date Aug 3 2021). We are tracking 24 Canadian Oil & Gas Operators who had 46 pipeline permits approved for Construction for a total of 92KM of oil & gas pipeline projects.

  • Pipeline construction permit count by province – Alberta Pipeline Permits (46),
  • Pipeline construction permits by area & project distance – Grovedale (46), Lodgepole (8.26), Bodo (7.59)

Download Western Canada Oil & Gas Pipeline Construction Permits


Western Canada Pipeline Construction Detail

Pipeline permits include gathering or transport pipelines of a liquid, gas or oil through a system of pipes. In addition to these main types of pipelines, there are also four other sub-categories of pipelines: Gathering Lines, Feeder Lines, Transmission Pipelines and Distribution Pipelines. The permits represent all types of pipelines. This section shows pipeline permits that have a new construction component. (Pipeline Construction Western Canada July 19 2021 report date )

Petroleum pipelines transport oil, oil products and natural gas. In addition to these two main types of pipelines, there are also four other sub-categories of pipelines: Gathering Lines, Feeder Lines, Transmission Pipelines and Distribution Pipelines. The permits represent all types of pipelines.

Pipeline Permits Approved Last Week

Pipeline Project Details

The following section provides details related to new pipeline construction permits

Keyera KAPS Laterals 

Keyera Energy Ltd. to construct the Key Access Pipeline System (KAPS) Project. The Project will transport NGL (C3+) and condensate (C5+) from Keyera’s Pipestone Plant, currently under construction in the Grande Prairie area in SW 07-073-08 W6M.

The low vapour pressure condensate (nominal pipe size [NPS] 16-inch diameter) pipeline will tie-into the existing Keyera condensate system in NW 18-055-21 W4M and the high vapour pressure (HVP) NGL pipeline (NPS 12-inch diameter) will tie-into Keyera’s Fort Saskatchewan Fractionation and Storage Facility (KFS) in SE 14-055-22 W4M. The total distance of the proposed pipeline will be 576 km long.

ARCHER EXPLORATION CORP. – 3 Permits in Ranbow Lake Well to Pipeline 

BONAVISTA ENERGY CORPORATION Permit #61383  3.14KM Well to Battery

Our Western core region is our largest area of operations, offering multi-zone oil and liquids rich natural gas resources, year round accessibility and extensive area infrastructure and services.

OBSIDIAN ENERGY LTD. Permit #16654  2.98KM Satellite to Pipeline

Obsidian Energy Ltd. (TSX: OBE) (NYSE: OBE) is an intermediate-sized oil and gas producer with a well-balanced portfolio of high-quality assets producing roughly 30,000 boe per day. These assets, and the organization we have crafted around them, provide the right platform to deliver bottom-line results, and an entrepreneurial spirit that will allow us to succeed in this evolving industry.

Cardium Play has been one of the largest oil fields in the Western Canada Sedimentary Basin with production history of almost six decades. … The areas with highest liquid content are Lochend and East Pembina, the highest initial production is typically encountered in Lochend, Willesden Green and Ferrier areas.

WEST LAKE ENERGY CORP. Permit #59930  1.58KM Battery to Battery

West Lake Energy Corp. is a privately owned, intermediate producer with core assets located in
the Lloydminster and Provost areas. West Lake’s strategy is to grow its production base in both
its heavy and medium areas through organic drilling complemented with focused acquisitions.
West Lake has applied advanced drilling and completion techniques, which has allowed its wells
to achieve compelling economic returns at sustained low oil prices. West Lake continues to
execute on a material multi-year drilling program.

The Lloydminster heavy oil region is centered around the City of Lloydminster on the Alberta/Saskatchewan border. This region’s production is predominantly heavy oil in the 12º to 16º API. Zones targeted include the Colony, Upper McLaren, Sparky, General Petroleum, Rex and Waseca at depths of 500 to 700 metres.

Western Canada Oil & Gas News



Sign-up Free Weekly Pipeline Permit Reports


* These fields are required.

About Enerlead Pipeline Report Overview

The location of the pipeline permits are the Western Canada Sedimentary Basin (WCSB) located in Western Canada including southwestern Manitoba, southern Saskatchewan, Alberta, northeastern British Columbia.

Pipeline permits are related to petroleum pipelines transport oil, oil products and natural gas. In addition to these two main types of pipelines, there are also four other sub-categories of pipelines: Gathering Lines, Feeder Lines, Transmission Pipelines and Distribution Pipelines. The permits represent all types of pipelines.

Additional Permit Reports