CleanBC funding Announcement for NE BC

The provincial government named the 25 funded projects on Monday— 13 of them are located in the northeast.

The new projects will support the adoption of cleaner technologies and reduce emissions in sectors, the province said.

Funded projects will support a wide range of clean technologies, including energy-efficiency improvements at pulp and paper mills, electrification of equipment in the mining and oil and gas sector using renewable energy, gas-capture systems at the Vancouver landfill and at oil and gas operations.

Wells Drilled in BC 2021

Northeast B.C. projects receiving CleanBC funding: 

  • ARC Resources Ltd. – Dawson Creek
    • Project Type: Fuel Switching
      Project Description: ARC Resources will connect their Dawson Creek Processing Plant to the low-carbon BC Hydro electric grid, replacing four onsite natural gas turbine generators that will be retired.
      Funding: $13.66M
      Emissions Reduced: 1million tCO2e through 2031
  • Canadian Natural Resources Ltd. – Northeast Region
    • Project Type: Fuel Switching
      Project Description: Canadian Natural Resources will replace 254 wellsite pneumatic methanol pumps with electric pumps operated by solar energy.
      Funding: $2.07M
      Emissions Reduced: 298,900 tCO2e through 2031
  • Canlin Energy Corp. – Fort St. John and Fort Nelson
    • Project Type: Fuel Switching
      Project Description: Canlin Energy will replace four natural gas compressor drivers and associated equipment with electric alternatives at four compressor stations located near Fort St. John and Fort Nelson.
      Funding: $1.57M
      Emissions Reduced: 90,500 tCO2e through 2031
  • Canlin Energy Corp. – Fort St. John 
    • Project Type: Fuel Switching
      Project Description: Canlin Energy will replace 21 wellsite pneumatic methanol pumps with electric pumps operated by solar energy near Fort St. John.
      Funding: $119,186
      Emissions Reduced: 12,500 tCO2e through 2031
  • ConocoPhillips Canada Resources Corp. – Northeast B.C.
    • Project Type: Methane Capture
      Project Description: ConocoPhillips Canada will capture and recover waste gas that was previously vented and flared during the completion flowback processes at 55 wells annually in northeast B.C. by utilizing pressurized gas storage and compression technology.
      Funding: $764,183
      Emissions Reduced: 70,200 tCO2e through 2031
  • Crew Energy Inc. – Northeast B.C.
    • Project Type: Methane Capture
      Project Description: Crew Energy will utilize a higher efficiency compressor to convert an existing natural gas-fired model at their Wilder Sweet Gas Plant in northeast B.C., reducing natural gas use.
      Funding: $103,308
      Emissions Reduced: 2,500 tCO2e through 2031
  • NorthRiver Midstream Inc. – Dawson Creek
    • Project Type: Electrification
      Project Description: NorthRiver Midstream will connect their Dawson Processing Facility to the low-carbon BC Hydro electrical grid to replace onsite natural gas generation.
      Funding: $7.5M
      Emissions Reduced: 690,000 tCO2e through 2031
  • NorthRiver Midstream Inc. – Dawson Creek
    • Project Type: Waste Heat Recovery
      Project Description: NorthRiver Midstream will install a waste heat recovery system at their Highway Processing Facility to reduce natural gas use in the heat medium system.
      Funding: $1.0M
      Emissions Reduced: 72,000 tCO2e through 2031
  • NorthRiver Midstream Inc. – Fort St. John
    • Project Type: Carbon Sequestration
      Project Description: NorthRiver Midstream will install a carbon and acid gas compression and injection system at their McMahon gas plant near Fort St. John to permanently store CO2 rich acid gas in a subsurface reservoir.
      Funding: $10.0M
      Emissions Reduced: 1.09 million tCO2e through 2031
  • Petronas Energy Canada Ltd. – Fort St. John
    • Project Type: Process Improvement
      Project Description: Petronas will install a vapour recovery unit at a gas processing plant in the Fort St. John area to capture natural gas currently flared and vented to atmosphere and utilize it in the production process.
      Funding: $482,320
      Emissions Reduced: 11,500 tCO2e through 2031
  • Storm Resources Ltd. – Fort St. John
    • Project Type: Waste Heat Recovery
      Project Description: Storm Resources’ Nig Creek Gas plant will install a heat exchanger to recover waste heat energy from compressor exhaust. The recovered heat will be used to pre-heat the hot oil system and reduce natural gas combustion.
      Funding: $652,500
      Emissions Reduced: 12,200 tCO2e through 2031
  • Tourmaline Oil Corp. – Northeast B.C.
    • Project Type: Methane Capture
      Project Description: Tourmaline Oil will connect vented gas capture units on 35 compressors at various processing and compressing stations, recovering natural gas currently vented to the atmosphere.
      Funding: $1.51M
      Emissions Reduced: 152,000 tCO2e through 2031
  • Tourmaline Oil Corp. – Northeast B.C.
    • Project Type: Methane Capture
      Project Description: Tourmaline Oil will replace 222 pneumatic drive actuators with electric drive equivalents, eliminating vented natural gas to the atmosphere.
      Funding: $1.03M
      Emissions Reduced: 44,500 tCO2e through 2031

Major Projects

WhiteWater Midstream 185 Mile Blackfin Pipeline Approval

February 2023 WhiteWater Midstream requested the Texas Railroad Commission for a new 185 mile pipeline permit for the Blackfin pipeline ...

Oilsands group pledges to spend $16.5B on carbon capture project by 2030

Canada's biggest oilsands companies say they will spend $16.5 billion before 2030 on a massive proposed carbon capture and storage ...

Alberta Carbon Grid gets go-ahead to evaluate 900,000-hectare potential CCUS site

TC Energy Corp. and Pembina Pipeline Corp. have agreed with the Government of Alberta to further evaluate a 900,000-hectare area ...

ExxonMobil to capture and store 2 million metric tons of CO2 emissions in Louisiana

ExxonMobil will then transport and permanently store the captured CO2 in secure geologic storage it owns in Vermilion Parish. As ...

Alberta selects 19 more CCS proposals

Alberta has selected 19 new proposals to develop carbon storage hubs in the Canadian province ...

Province invests over $15 million in northeastern B.C. clean energy projects

The province of BC has announced that it is investing in projects that will reportedly reduce climate pollution, create job ...

Cedar LNG receives extension to build BC terminal

A four-year Canadian export license extension has been granted to the delayed Cedar LNG project, which will be sited on ...

Alberta to lead the country in renewables boom

The following are the top five projects slated to come online this year: Buffalo Plains Wind Farm, generating 514.6 MW; ...

Ironwood Midstream to build 24 Mile Pipeline to link KARNES to GONZALES

Ironwood Midstream formed in 2015 to provide oil and gas producers with midstream services in the Permian Basin and the Eagle ...

Energy Transfer approval for new pipeline named Warrior

Energy Transfer get regulatory approval for the Midland Express AKA Warrior pipeline project that will connect natural gas in the ...

LNG plant for Port Edward

A small-scale liquefied natural gas facility planned at Port Edward is the latest project to offer the potential for rate ...

Whistler Pipeline Capacity Expansion

WhiteWater today announced the expansion of the Whistler Pipeline’s mainline capacity through the planned installation of three new compressor stations ...

Pipeline slated to carry Bakken oil toward a Wyoming hub

Bridger Pipeline is building the 145-mile South Bend Pipeline from Johnsons Corner in McKenzie County to one of the company’s ...

Woodfibre LNG construction is a go

After years of delays, the $1.6 billion Woodfibre LNG project in Squamish is finally officially a go ...

TC Testing Support to Expand Marketlink Oil Transport from Oklahoma to Texas Coast

TC Energy Corp. is gauging customer interest in oil transportation services that would connect Oklahoma crude supply with downstream refining ...

Enbridge CEO – Canadian LNG sector anticipating new projects

Canadian oil and gas leaders believe the window is opening once again to build new liquefied natural gas projects in ...

Imperial renewable diesel Strathcona refinery

Imperial plans to construct a world-class renewable diesel complex at its Strathcona refinery near Edmonton, Alberta ...

Six proposed carbon storage hubs in Alberta

The province Alberta on March 31 selected six proposals to move forward with developing Canada's first carbon storage hubs, intended ...

Pembina and TC Energy Partner to Create World-Scale Carbon Transportation and Sequestration Solution: The Alberta Carbon Grid

Pembina's proposed acquisition of Inter Pipeline Ltd. ("IPL"), ACG is designed to connect the province's largest sources of industrial emissions ...

Enhance Energy announces the Origins Project, a Carbon Sequestration Hub in Central Alberta

Enhance Energy, operator of Alberta's largest CCUS initiative and founding partner of the Alberta Carbon Trunk Line (ACTL) Project, has ...