Exxon’s Permian Factory Model in Action:RICHARDS-GRISHAM Lease
Exxon’s RICHARDS-GRISHAM lease demonstrates a true Permian factory model, with tightly batched permits, standardized well designs, predictable drilling cadence, and ...
Why Liberty Believes the U.S. Market Is Setting Up for Tightening Frac Supply Conditions
iberty Energy’s Q4 2025 earnings call made one message clear: tightening conditions are not being driven by higher rig counts, ...
Chevron: Q4/2026 Record Production, Permian Scale, and a Clear U.S. Growth Strategy
Chevron’s 4Q 2025 results reinforced the strength of its U.S. growth strategy, delivering record production, strong operating cash flow, a ...
Even With Lower Oil Prices in 2025, ExxonMobil Delivered Strong Results — Powered by the Permian
Even with lower oil prices in 2025, ExxonMobil delivered strong results through record production, disciplined capital spending, and industry-leading cost ...
2026 Is Shaping Up as One of the Strongest Western Canada Drilling Starts of the Last Three Years
2026 is shaping up as one of the strongest Western Canada drilling starts of the past three years, with wells ...
Montney Gas Plant Expansions Signal the Basin’s Next Growth Phase in Canada
Midstream expansions at Wapiti, Simonette, and Pipestone signal that the Montney remains one of North America’s most durable growth basins, ...
Cedar LNG Project Update: Pembina Advances Canada’s Next LNG Export Facility
Cedar LNG is a floating LNG export facility near Kitimat, British Columbia, being developed by Pembina Pipeline and the Haisla ...
Logan Energy Advances Montney-Scale Development at Gordondale, AB Canada
Logan Energy is transitioning Gordondale into a true Montney-scale development, supported by steady well permitting, confirmed drilling activity, and a ...
SM Energy–Civitas Merger Approval Clarifies the 2025–2026 Drilling Map
The SM Energy–Civitas merger approval brings together a multi-basin drilling portfolio with clear 2025–2026 activity concentration in the Uinta Basin, ...
Nile Midstream Expands Permian Footprint with Delta Crude Express Pipeline Approval
Nile Midstream received Railroad Commission approval in January 2026 to operate the 18.5-mile Delta Crude Express crude oil pipeline across ...

